Leicester: damp and repairs

Leicester allows itself 260 days for a routine repair. What binds them regardless, and what to do when nothing happens.

This page applies to England. The law is different in Wales, where Awaab's Law does not apply at all. See our Wales guidance.

Homes
19,407Social rented, 2024-25
Their repair target
260 daysNon-emergency, their own
Failing decency
0.5%Median council: 3.3%

What stands out in Leicester's figures

A low stock condition figure, with the usual caveat

Leicester reported 0.5% of homes failing the Decent Homes Standard, below the council median of 3.3%. Worth knowing that landlords assess their own stock and the regulator publishes what it receives without auditing it, so a low figure can mean good homes or can mean not every home has been surveyed.

A routine repair target of 260 days

That is roughly 9 times the median target of 28 days across the 178 landlords here, and only 0 of them allow longer. A repair that takes 37 weeks is recorded by Leicester as on time. The same repair would be badly overdue at most landlords. Their target is a service promise, not a legal deadline: the law requires repairs within a reasonable time, and you are entitled to argue that 260 days is not reasonable for your problem.

Emergencies get handled, routine repairs drift

89.6% of emergency repairs were completed in target against 73.2% of non-emergency ones, a gap of 16 points. That pattern usually means resource is being pulled towards whatever is on fire, which is cold comfort if your problem is the slow kind that only becomes an emergency later.

Tenants rate the work higher than the wait

Satisfaction with the repairs service was 74% but satisfaction with the time taken was 65.9%, a gap of 8 points. That usually means the repair is done properly once someone turns up, and the problem is how long that takes. Worth framing a complaint around the delay rather than the workmanship.

These scores came from a face to face survey

The regulator cautions against comparing landlords on individual measures without allowing for how the survey was run. Leicester's was predominantly face to face, and method affects who answers: online surveys tend to reach people who are comfortable online and already engaged with the landlord. Region, tenant age and the share of supported housing all move these numbers too.

What binds them regardless

Those 260 days are a service promise Leicester made to itself. Awaab's Law is different, because it is law and it overrides them. Emergency hazards: 24 hours to investigate and make safe. Damp or mould posing a significant risk of harm: 10 working days to investigate, a written summary within 3 working days of finishing, safety work started within 5. When the clock actually starts.

Leicester's 2024-25 return in full

MeasureLeicesterSector median
Stage 1 complaints answered in time 72.6%
17.3 points worse than the median
89.9%
Stage 2 complaints answered in time 79.3%
9.6 points worse than the median
88.9%
Non-emergency repairs inside their own target 73.2%
9.3 points worse than the median
82.5%
Emergency repairs inside their own target 89.6%
5.3 points worse than the median
94.9%
Satisfaction with the approach to complaints 39.1%
3.6 points better than the median
35.5%
Satisfaction with time taken on the last repair 65.9%
3.6 points worse than the median
69.5%
Satisfaction that the home is well maintained 68.9%
3 points worse than the median
71.9%
Satisfaction that the home is safe 78.3%
0.7 points better than the median
77.6%
Satisfaction with the repairs service 74%
about the same as the median
73.6%
Homes not meeting the Decent Homes Standard 0.5%
about the same as the median
0.5%
129 landlords reported worse Non-decent homes, every landlord ranked

If a repair is not happening

Put it in writing and keep the reference, because that date is what every later deadline counts from. If nothing moves, make a formal complaint rather than another chaser. They must acknowledge within 5 working days and respond within 10 of that, then stage two must be handled by someone not involved first time and answered within 20 working days.

How council complaints work, and after that the Housing Ombudsman Service, which is free, can order the repair as well as compensation, and takes no percentage. What to ask before signing with anyone.

If it is damp or mould Start here, whoever your landlord is

Common questions

What is Leicester's target for a repair?

260 days for a non-emergency responsive repair, and 24 hours for an emergency. They met the non-emergency target 73.2% of the time in 2024-25. The median target across the 178 landlords we hold data for is 28 days.

This is their own service target, not a legal deadline. The law requires repairs in a reasonable time, which is not defined and depends on the problem.

How many Leicester homes fail the Decent Homes Standard?

102 of 19,407, which is 0.5%. The median council reported 3.3%.

These are self-reported figures and the regulator publishes them without auditing them, so they are a reasonable basis for a question and a poor basis for a conclusion. Every landlord ranked on this measure.

What if Leicester misses a deadline?

Complain formally, using the words "I am making a formal complaint", then escalate to stage two, then take it to the Housing Ombudsman Service. All three are free and you keep every penny of any award. Leicester answered 72.6% of stage one complaints in time in 2024-25, so diarise your dates.

Do these figures measure damp and mould?

No. There is no damp and mould measure anywhere in the Tenant Satisfaction Measures, for this landlord or any other. Damp can make a home fail the Decent Homes Standard through the hazard route, but nothing here counts damp cases.

Figures contain public sector information licensed under the Open Government Licence v3.0. Source: Regulator of Social Housing, Tenant Satisfaction Measures 2024-25 (v1.1), published 4 November 2025. Reported by the landlord for the year to 31 March 2025 and not independently audited.