Tamworth: damp and repairs

What Tamworth Borough Council publishes about its own performance, the deadlines that bind it, and the free routes when repairs stall.

This page applies to England. The law is different in Wales, where Awaab's Law does not apply at all. See our Wales guidance.

Homes
4,299Social rented, 2024-25
Their repair target
26 daysNon-emergency, their own
Failing decency
6.4%Median council: 3.3%

What stands out in Tamworth's figures

Where the stock condition figure sits

6.4% of homes failed the Decent Homes Standard, which is 273 of 4,299. That is above the council median of 3.3% but a long way from the worst in the data. It is the kind of figure that usually reflects an identifiable backlog rather than a problem across the whole stock.

Their complaints process frequently misses its own deadlines

Tamworth answered 43.5% of stage one complaints within the Housing Ombudsman Code timescales, against a median of 89.9%. At stage two it managed 50% against a median of 88.9%. This matters practically: if your complaint passes its deadline you do not have to keep waiting, and you can take it to the Housing Ombudsman Service at that point.

Fewer tenants here feel their home is safe

67.5% against a sector median of 77.6%. Of all the perception measures this is the one that most directly concerns the condition of the building, and a figure this far below the median is the one to quote back.

No single survey method dominated here

The regulator recorded no predominant method for Tamworth's survey, meaning responses were spread across channels rather than concentrated in one. That makes its scores slightly harder to line up against a landlord that surveyed one way, and is another reason to treat small differences between landlords as noise.

What binds them regardless

Everything above is Tamworth measuring itself against its own promises. Awaab's Law is different, because it is law and it overrides them. Emergency hazards: 24 hours to investigate and make safe. Damp or mould posing a significant risk of harm: 10 working days to investigate, a written summary within 3 working days of finishing, safety work started within 5. When the clock actually starts.

Tamworth's 2024-25 return in full

MeasureTamworthSector median
Stage 1 complaints answered in time 43.5%
46.4 points worse than the median
89.9%
Stage 2 complaints answered in time 50%
38.9 points worse than the median
88.9%
Satisfaction with time taken on the last repair 59%
10.5 points worse than the median
69.5%
Satisfaction that the home is well maintained 61.6%
10.3 points worse than the median
71.9%
Satisfaction that the home is safe 67.5%
10.1 points worse than the median
77.6%
Satisfaction with the approach to complaints 26.2%
9.3 points worse than the median
35.5%
Satisfaction with the repairs service 65.9%
7.7 points worse than the median
73.6%
Homes not meeting the Decent Homes Standard 6.4%
5.9 points worse than the median
0.5%
Emergency repairs inside their own target 92%
2.9 points worse than the median
94.9%
Non-emergency repairs inside their own target 80.9%
1.6 points worse than the median
82.5%
41 landlords reported worse Non-decent homes, every landlord ranked

If a repair is not happening

Put it in writing and keep the reference: that date is what every later deadline counts from. Then go to a formal complaint sooner than you otherwise might. Given that Tamworth answered 43.5% of stage one complaints inside the required timescales, the realistic plan is to log the complaint, note the date it was due, and treat the missed deadline as your route onward rather than something to chase.

How council complaints work, and after that the Housing Ombudsman Service, which is free, can order the repair as well as compensation, and takes no percentage. What to ask before signing with anyone.

If it is damp or mould Start here, whoever your landlord is

Common questions

What is Tamworth's target for a repair?

26 days for a non-emergency responsive repair, and 24 hours for an emergency. They met the non-emergency target 80.9% of the time in 2024-25. The median target across the 178 landlords we hold data for is 28 days.

This is their own service target, not a legal deadline. The law requires repairs in a reasonable time, which is not defined and depends on the problem.

How many Tamworth homes fail the Decent Homes Standard?

273 of 4,299, which is 6.4%. The median council reported 3.3%.

These are self-reported figures and the regulator publishes them without auditing them, so they are a reasonable basis for a question and a poor basis for a conclusion. Every landlord ranked on this measure.

What if Tamworth misses a deadline?

Complain formally, using the words "I am making a formal complaint", then escalate to stage two, then take it to the Housing Ombudsman Service. All three are free and you keep every penny of any award. Tamworth answered 43.5% of stage one complaints in time in 2024-25, so diarise your dates.

Do these figures measure damp and mould?

No. There is no damp and mould measure anywhere in the Tenant Satisfaction Measures, for this landlord or any other. Damp can make a home fail the Decent Homes Standard through the hazard route, but nothing here counts damp cases.

Figures contain public sector information licensed under the Open Government Licence v3.0. Source: Regulator of Social Housing, Tenant Satisfaction Measures 2024-25 (v1.1), published 4 November 2025. Reported by the landlord for the year to 31 March 2025 and not independently audited.