We are not solicitors. This site is free information only. We do not take claims, we do not pass your details to anyone, and we never ask you to sign anything. Who we are

How long does your landlord have?

There are now two completely different answers depending on who your landlord is, and one of them is a set of hard deadlines.

This page applies to England. The law is different in Wales, where Awaab's Law does not apply at all. See our Wales guidance.

Social landlord, damp or mould
10 daysTo investigate, then fixed deadlines after that
Emergency hazard
24 hoursInvestigate and make safe
Private landlord
ReasonableNo fixed deadline in law yet

If you rent from a council or housing association in England

You have real deadlines. Awaab’s Law came into force on 27 October 2025 and applies to registered providers of social housing. For damp and mould, and for emergency hazards, the timescales are fixed in regulations rather than left to argument.

Awaab's Law timescales for social landlords in England You report a hazard in writing on day zero. The landlord must investigate within ten working days. Within three working days of the investigation concluding, it must send you a written summary of the findings. Within five working days of the investigation concluding, it must begin any repair work needed. Separately, an emergency hazard must be investigated and made safe within twenty-four hours. 1 DAY 0 You report it in writing Email or the landlord's portal. Keep the copy. 2 WITHIN 10 WORKING DAYS The landlord must investigate A proper inspection, not a phone call. The next two clocks start when that investigation ends 3 WITHIN 3 WORKING DAYS OF THAT Written summary of the findings In writing, to you. Keep it. 4 WITHIN 5 WORKING DAYS OF THAT Repair work must begin Begin, not finish. Completion must be reasonable. EMERGENCY HAZARD Make safe within 24 hours
Where the clock starts matters. The repair deadline runs from the day the investigation concludes, not the day you reported the problem. A landlord that drags out the investigation delays everything after it, which is why the date of your original written report is worth keeping.

The detail, including what counts as an emergency and what happens when a deadline is missed, is on our Awaab’s Law timescales page.

More hazards join on 30 November 2026

Phase 2 extends the same deadline structure to excess cold, excess heat, falls, structural collapse, fire and explosions, electrical hazards and domestic hygiene. What changes in phase 2.

If you rent privately in England

Awaab’s Law does not apply to you yet. The Renters’ Rights Act 2025 contains the power to extend it to the private rented sector, but the government has not confirmed a date, and we are not going to invent one.

So your landlord’s obligation is the older one: to carry out repairs within a reasonable time of being told about them. There is no statutory definition of that, and no single case pins it down. What courts weigh up is:

  • How serious the problem is, and what risk it creates
  • Whether anyone is living in the home, and who
  • How readily available the parts or trades are
  • How long the landlord has known

No heating in midwinter with a baby in the house is a different question from a dripping tap. The vaguer standard is not necessarily a weaker one, but it does mean you need a record.

Your strongest free route as a private renter

Your council’s environmental health team can inspect under the Housing Health and Safety Rating System and, where they find a serious hazard, require your landlord to do the work. You do not need your landlord’s permission to ask for an inspection, and it costs nothing.

What the council must do once it inspects

This part is widely misunderstood, so here it is plainly. Since 23 June 2026 hazards are scored into three bands, High, Medium and Low, replacing the old A to J system. A category 1 hazard is one in the High band.

What they find What the council must do
Category 1 (High band) They must take enforcement action, and must choose the course they consider most appropriate
Category 2 (Medium or Low) They may take action. It is a power, not a duty
“Must act” is not the same as “must fix”

The council’s duty is to take the action it considers most appropriate, and one of the options available to it is a hazard awareness notice, which simply advises the landlord that the hazard exists and requires nothing to be done. If that is what you get, you can ask the council in writing why it considered that the most appropriate course, and you still have your own claim under section 9A.

Where a category 1 hazard involves an imminent risk of serious harm, the council can take emergency remedial action itself, or make an emergency prohibition order taking effect immediately.

If you are a council tenant, this route is closed to you

A council cannot take enforcement action against itself, so HHSRS enforcement is not available against your own landlord. Your routes are Awaab’s Law, the Housing Ombudsman, and a claim under section 9A. Housing association tenants can ask the council to enforce.

What to do when the deadline passes

  1. Put the missed deadline in writing

    Name the date you reported it, the date the deadline fell, and what has not happened. Keep it factual.

  2. Make it a formal complaint

    Use the words “I am making a formal complaint”. A repair chaser is not a complaint and does not start the clock that leads to the Ombudsman. How complaints escalate.

  3. Escalate, then go to the Ombudsman

    Social tenants can take it to the Housing Ombudsman free of charge, and can go there if the landlord fails to respond within its own published timescales.

Next Complaining about your landlord, in the right order

Common questions

How long does a council have to fix damp?

Since 27 October 2025, a council or housing association in England must investigate a reported damp or mould hazard within 10 working days, send you a written summary within 3 working days of that investigation concluding, and begin any safety work within 5 working days of it concluding. If the hazard is an emergency, they must investigate and make it safe within 24 hours.

What if my landlord is private?

Awaab’s Law does not apply to private landlords yet. The Renters’ Rights Act 2025 contains the power to extend it, but no date has been confirmed. For now the standard is a reasonable time, which is judged on the facts. Your strongest lever is usually your council’s environmental health team.

Is there a legal definition of a reasonable time?

No. It is not defined in the Landlord and Tenant Act 1985 and no single case fixes it. Courts look at how serious the problem is, how hard the parts are to obtain, and whether you are living in the home. A day without heating in January is judged differently from a day without heating in July.

My landlord keeps sending someone to look but nothing happens. Does that count?

Inspections are not repairs. Under Awaab’s Law the clock for starting work runs from the day the investigation concludes, so repeated inspections that never conclude are a problem the law is alive to. Ask in writing for the written summary of findings you are entitled to, and put a date on the request.

Can I withhold rent until it is fixed?

This is risky and we would not suggest it without advice. Rent arrears can lead to eviction proceedings, and the right to set repair costs against rent is narrow and easy to get wrong. Get advice from Shelter or your local Citizens Advice before withholding anything.